Cibes UNO 4 Stops (1035 x 1450 mm) @Lub D Bangkok Siam
Project Summary
Project Details
Lift Model
Cibes Uno
Building Type
Hotel
Installation Location
Others
Number of Floors
4
Completed
November 2025
Installation Time
10 Working Days
Challenge
Improve access between floors for hotel guests while minimising the impact on the existing hotel space.
Solution
A Cibes screw-driven lift was selected to suit the existing building layout. Its fast installation and easy operation helped reduce the need for additional construction work.
Result
The lift makes it easier for guests to move between floors and improves accessibility throughout Lub d Bangkok Siam.
Technical Specifications
Installed Lift Specs
ModelCibes UNO
Range DesignStandard
Capacity400 kg / 5 Person
Stops4
Lift Size1035 x 1450 mm
Screw Driven SystemEcoSilent 2.0
Wall PatternsOrganic Signal White
FlooringPeat